Correlation table of economic indicators of different template

correlation table of economic indicators of different template

Item

Wood template

Steel template

Aluminum alloy template

the number of use of the template system component commonality

5-6

50-100

More than 300 times

Model system cost (including all accessories)


About 150 Yuan/


S24/

About 800 Yuan/

S129/

About 1500 Yuan/

S240/

Installer (average)

25 Yuan/

S4/

20 Yuan/

S3.2/

20 Yuan/

S3.2/

Installation cost of mechanical engineering

1 Yuan/

S0.16/

5 Yuan/

S0.8/

free

returned value

No recycling value plus cleaning fee

middle

high

maintenance charge

low

high

low

Cost of 30 stories in single building

53 Yuan/

S8.64/

52 Yuan/

S8.39/

70 Yuan/

S11.3/

Cost of 30 stories in two buildings

53 Yuan/

S8.64/

52 Yuan/

S8.39/

46 Yuan/

S7.6/

Cost of 30 stories in 3 buildings

53 Yuan/

S8.64/

52 Yuan/

S8.39/

38 Yuan/m

S6.12/

Cost of 30 stories in 5 buildings

53 Yuan/

S8.64/

52 Yuan/

S8.39/

34 Yuan/

S5.48/

Cost of 30 stories in more buildings

53 Yuan/

S8.64/

52 Yuan/

S8.39/

The more the building, the lower the cost